Swimming pool construction begins with excavation where the pool is formed to the correct elevation, excavated to the correct depth, and contoured. A steel frame is set to hold the structure of the pool together and light niches are set. If Olympic Pool is building an in-ground concrete pool, a specially formulated concrete known as Gunite is then “shot” into place, hand troweled and shaped. If you have selected a vinyl lined pool, the structure of the pool is built of reinforced steel and the surface is prepared for selected vinyl that will line the pool.
The pool coping and tile (as chosen) are added. Then the landscaping, deck, and pool surround materials are installed. The swimming pool is filled, the equipment started up, and the water is tested so that a chemical balance can be established.